Kerrick KH3030D Diesel Pressure Washer 3000 psi
Looking for a water blaster that has the grunt of diesel power, operates at 3000 psi, 30 lpm unit and has electric start, then the KH3030D could be what you're after. This diesel water blaster is equipped with a Hawk pump, Kohler motor and a galvanised wheel mounted roll frame making. A robust practical unit it’s great for situations where heavy duty water blasting is required.
Features
- Galvanised 4 wheel roll frame with balanced lifting point
- Safety shut off gun and lance
- 10 metre 3/8 high pressure hose
Comes With
- Gun and Lance
- 10m Double Braided Wire Hose
- Swivel Gun Double with Nozzle
Additional Features
Brand: Kerrick |
Model: KH3030D |
Flow: 30LPM |
Motor Power: 22HP |
Voltage: Single Phase 230-240V 50Hz |
Pump Make: Hawk Pumps |
Max Temperature: Cold water |
Sewer Hose: 3/8 in two wire braid |
Hp Hose Length: 10M |
Fuel Tank Size: 12L |
Wheels: 4 |
Weight: 130Kg |
HOW MUCH WILL MY DELIVERY COST?
No matter where you live in Australia, our delivery service charges are as follows:
Note: Please allow extra time for delivery around public holidays. In order to qualify for our delivery service
- the products that you ordered have to be in stock
- they must be ordered online
- accurate delivery details must be provided
- your delivery address must be within Australia
- Authority to leave parcel at premises
IF YOU HAVEN’T RECEIVED YOUR ONLINE ORDER OR IF YOU HAVE ANY QUESTIONS ABOUT AN ORDER THAT YOU HAVE PLACED, PLEASE CONTACT CUSTOMER SERVICE AND WE’LL GET ON THE CASE STRAIGHT AWAY.
HOW LONG WILL MY ORDER TAKE TO ARRIVE?
Here is an approximate guide to delivery times for online orders once they have been dispatched.
BUSINESS DAYS TO DELIVERY
NSW | |
---|---|
City | 1 Day |
Regional | 2-3 Days |
VIC | |
Melbourne | 1 Day |
Regional | 3-4 Days |
Queensland | |
Brisbane | 1-2 Days |
Regional | 3-4 Days |
South Australia | |
Adelaide | 2-3 Days |
Regional | 4-5 Days |
Northern Territory | |
All Areas | 4-6 Days |
Western Australia | |
All Areas | 4-6 Days |
Tasmania | |
All Areas | 4-6 Days |